Job scheduler chart for skip/hook operators

Wednesday, 23 April, 2008 | Supplied by: ASP Software

Job scheduler chart for skip/hook operators

Scheduling a bulk skip or hook lift delivery, exchange or pickup is now easier with the Wastedge graphical scheduler work planning board. It shows the user how many jobs are queued behind which drivers on any day, then lets you drag and drop jobs to reassign work amongst available drivers to better balance workloads.

Colours can be set to represent a different bin size or the type of service (eg, DEL, EXCH, REM, E&R) and the text on the job-bars can be set to display street or suburb and service type combinations.

The length of the job bars can also be auto-set based on the bin size and type of service, or the distance of the job address from your depot, so you have an estimate of expected job times.

When combined with Google-maps integration, the user can also see where these jobs are on the map, where area zones can be set up to help auto-assign jobs to drivers as well as determining price zones for jobs at different distances.

 

Online: www.aspsoftware.com.au
Phone: 02 9499 6222
Related Products

REDWAVE TEX textile sorting solution

The REDWAVE TEX is a flexible sorting solution designed specifically for the textile industry.

PCO.Tech pco.pixelfly 1.3 SWIR camera

The pco.pixelfly 1.3 SWIR is a machine vision camera with an InGaAs image sensor that is...

Emi Controls V12so Odour Control Cannon

The V12so Odour Control Cannon combines four different functions in one machine — eliminate...


  • All content Copyright © 2024 Westwick-Farrow Pty Ltd